Prequalification Results

March 27, 2018


Phase 1 Make Ready Work:

BP 01 - Earthwork & Site Demolition

BP 02 - Rammed Aggregate Piers

BP 03 - Site Utilities

BP 05 - Site Electrical*

 

Phase 2 Balance of Specialty Trades:

BP 06 - Cast-in-Place Concrete

BP 07 - Masonry*

BP 08 - Structural Steel, Metal Decking & Misc Fabrications

BP 09 – Miscellaneous Fabrications (absorbed into BP 08)

BP 10 - Finish Carpentry & Millwork

BP 11 - Roofing & Waterproofing

BP 12 - Flashing, Sheet Metal & Expansion Joints

BP 13 - Doors, Frames & Hardware

BP 14 - Overhead Coiling Doors*

BP 15 - Glass & Glazing

BP 16 - Metal Stud Framing, Drywall & Ceilings

BP 17 - Tile*

BP 18 - Ceilings* (absorbed into BP 16)

BP 19 - Wood Flooring

BP 20 - Resilient Flooring*

BP 21 - Terrazzo

BP 22 - Painting

BP 23 - Miscellaneous Specialties

BP 24 - Theatrical Equipment & Seating

BP 25 - Seating (absorbed into BP 24)

BP 26 - Tensioned Fabric Structures*

BP 28 - Fire Suppression

BP 29 - Plumbing

BP 30 - HVAC

BP 31 - Electrical & Low Voltage Systems

BP 32 - Site Concrete

BP 33 - Landscape & Irrigation

 

*Prequal requirements waived for indicated bid packages

**Dates are subject to change